0

XD1033 Master Slave presentation Sync

I have 4 XD1033's with video content looping. I setup an interrupt for all unit at 1pm to go to a certain presentation. I set the first one as the master presentation with the other 3 as slave presentations for the interrupt. I can't seem to get the sync variable to trigger the other 3 to change their content when the master changes its content.

 

I cannot use Brightwall because I have both images and videos in all my 4 presentations. I used the link synchronize command to setup the variables in the master and used the sync event in all the 3 slave presentations

3 comments

  • 0
    Avatar
    olabode Adegbayike

    All the Units are on the same subnet and i am using Simple File Networking.

  • 0
    Avatar
    Bright Scripters

    You could still use BrightWall, by converting each image to a video.

    The length of video, would be the original image duration.

    Is that applicable?

  • 0
    Avatar
    olabode Adegbayike

    We don't want to convert the images to video. But we have found a work around.

    Thanks

Please sign in to leave a comment.