We are testing the Brightsign Network and I read there is a way as of 3.8 to interrupt scheduled presentations but I am not having much luck interrupting an all day every day schedule. How is this done? We would like to keep a dynamic playlist running all the time on all the screens and then interrupt individual screens at various times for event information that is only relevant at that location. Having to unscheduled and reschedule the active all day every day presentation for all the locations for event information seems very tedious and would likely run into scheduling mistakes. Open to ideas since we are still evaluation the system.
Thank you