Have spend a lot of time trying to author simple project using the enhanced sync to sync several xd230 players, When published the platers show an red error led and dont run. after much testing it seems that creating an identical presentation in BA 4.6 rather than 4.7 it works perfectly. The failure only occurs when checking the enhanced sync box in Ba 4.7, normal sync works fine, but in the previous version of BA its fine with the enhanced sync. Is this a know issue and is there a fix?
0 comments
Please sign in to leave a comment.