0

presentations and scheduels for SimpleNet



I just starting to make multiple presentations on multiple schedules for my simple network systems. I wanted to make sure I am doing the best practice. I created one master presentations and use it to schedule as default presentation with default media content. Example: I want my master presentation to run all day accept for 3pm to 5pm every day I want a different presentations. I create a second presentation called 3to5pm. I add the media content and save it. I open the master presentation and add the 3to5pm presentation to the master schedule time slot and then publish. I was a little unclear but the schedule is not part of any presentation by default. but in simple network it looks like you need one presentation to act as the master to publish a schedule to the BS box. Then just add what ever other presentations you want to the master presentation schedule. So in Simple network you do need one presentation to act as the master scheduler when publishing?

1 comment

  • 0
    Avatar
    RokuLyndon


    There's no schedule attached to the presentation with simple or local publishing. When you open brightauthor, it starts a new schedule. If you want to store a specific schedule, and then edit it later, under Publish, there's a schedule menu. You can save any schedule you're working on.

    Then, if you open brightauthor and want to publish something based on a previous schedule, you go back to the schedule menu, and open the the schedule you save.
Please sign in to leave a comment.