I’ve had a recurring problem with Brightsign. When I’m trying to schedule something a week in advance, it sends the presentation back a week. I’ll drag it onto the correct date but it doesn’t appear in the schedule. When I use the arrows to go back a week the presentation is there. So, for instance, today I’m dragging the presentation onto Tuesday 20th it appears on the 13th. It sometimes means that I can’t schedule something until the morning of or the night before which often means logging in on a Sunday. It only happens when I’m trying to schedule for the next week – any ideas?

 

2 comments

  • 0
    Avatar
    Lyndon

     

    That sounds like a bug.  What brightauthor version are you using? 4.6.0.36? We've had other 4.6 builds.

    What are your exact steps. I just tried it but can't duplicate. I'm using 4.6.0.36. I hit the right arrow at the top to change to next week. I then dragged a project into my schedule on 3/27, and it added it on 3/27.

  • 0
    Avatar
    Brandon

    There was a bug (24866) that dealt with drag-and-drop of Interrupt schedules landing in the wrong spot.  That was fixed in BrightAuthor 4.7

    If you're not using Interrupt schedules or already using BrightAuthor 4.7, please send exact steps to reproduce.