I have 2 presentations that are identical (except that the second one contains one extra slide). I am using my local network to broadcast them so I cannot use dynamic playlists.
The extra slide is an announcement that happens in the afternoon. So I simply schedule one for the morning and one for the afternoon.
I update both presentations daily. As a result, I have to update the exact same slides twice because they are identical.
There must be a better way to do this. How can I create presentation A and then presentation B (where B is A+1 slide)