I am using BrightSign Author with a local network setup. I have 5 players. I want to schedule presentation A on unit 1, presentation B on units 2,3,4, and presentation C on unit 5.
I seem to be missing the step where to specify the unit to play the presentation when scheduling. I can only schedule the presentation(s) to play on all the units.
Thanks!
